EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
EH-SlingTSI
-
Listing for Category : firewall
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (112)
Research
- (3)
-
EAA TA visit
-
Visiting Sasha and...
-
Went for a ride
Workshop
- (1)
-
Started setting up -...
Empennage
- (30)
-
The tail feathers...
-
Finally done!
-
Finished the elevator!
-
Got some help with...
-
Putting the...
-
More help riveting
-
First test fit of...
-
Elevator Trim Tab
-
Future me will thank...
-
Starting work on the...
-
Bought some lights
-
(Almost) Finishing...
-
Finished up the...
-
Vertical stabilizer,...
-
Build the vertical...
-
Started building the...
-
Just bought a VOR...
-
Finished the...
-
Started work on the...
-
Tried to close up...
-
Getting closer on...
-
Starting to assemble...
-
Got some...
-
Dimpling the...
-
Doing the dimples -...
-
First completed part...
-
First test fit
-
It's finally here!
-
Splicing wire to the...
-
Decided to give it a...
Fuselage
- (19)
-
More work on the...
-
A little progress on...
-
Happy day - one fuel...
-
Starting to work on...
-
Gasket Material for...
-
Built a center...
-
Setting up the...
-
FInally finished the...
-
I *think* I am...
-
Oops - forgot to put...
-
Rear Seat Backs
-
Powder coat the...
-
Rear Seat Bottom
-
Rudder pedals
-
Another 80 rivnuts
-
Much easier time...
-
Finished the rudder...
-
Parachute Rocket...
-
Burned by the...
Firewall
- (2)
-
Woo hoo! Hanging the...
-
Prepping for the engine
Tail Feathers
Wings
- (11)
-
(Re)Did some work on...
-
Is it leaktight?
-
Putting the Al rims...
-
Finished the left flap
-
Match drilling the...
-
Attaching the...
-
Time to make some...
-
Fixed the Rivnut, kinda
-
Half Flaps
-
Rivnuts for some...
-
Last bit of work...
Controls
- (10)
-
Aileron Links and an...
-
The control tube...
-
Autopilot servos!
-
Re-did the steering...
-
The ailerons - glad...
-
Center Console...
-
Elevator and flap...
-
Long elevator pushrod
-
Ay-ay-eyebolts,...
-
Had some time to...
Avionics
- (4)
-
More pictures of the...
-
The guts are going in
-
Final payment
-
First call with...
Lighting
Instrument Panel
Landing Gear
- (1)
-
Thems the brakes....
Engine
- (2)
-
More engine plumbing!
Propeller
Fuel System
Interior Finish
- (2)
-
Carpeting is mostly...
-
Getting the heating...
Paint / Decals
- (1)
-
It's starting to...
Inspection
- (2)
-
I'm official now!
-
Got my tail number -...
Tools
- (9)
-
Built some tables,...
-
Just a quick...
-
Right angle drill head
-
Build the Sling wing...
-
Shortening the Rivets
-
Difference between...
-
Finally broke down...
-
Needed new Rivet gun...
-
Catch all for tools
Overall
- (8)
-
Paying for avionics,...
-
The drive south and...
-
Loading up for a move
-
Happy and sad day -...
-
Finally finished...
-
Big day today - got...
-
The rest of the kit...
-
Bought a Sling...
Seats
- (7)
-
Upholstery is...
-
Inner seat rails...
-
Rear Seat belts...
-
Finishing the Dzus...
-
Putting the rear...
-
FINALLY got the Dzus...
-
First pass at the...
Builder Name:
Edward Hefter
-
Project:
SlingTSI
-
VIEW REPORTS
Total Hours:
478.65
Total Flight Time:
Start/Last Date:
Sep 22, 2020 - No Finish Date
Engine:
Rotax 915iS
Propeller:
Airmaster 3 Blade Constant Speed propeller
Panel:
G3X
Friendly URL:
https://eaabuilderslog.org?s=EH-SlingTSI
Home or Last Project Picture
Nov 16, 2023
Woo hoo! Hanging the engine!!!
- (3 hours)
Category: Firewall
Finally got to hang the engine. Tons of guidance and help from Shawn. Actually, I was helping him since he knows what he's doing, but we got that thing mounted and torqued up. Great feeling!
Engine mount, ready for an engine!
Rotax 915iS engine
Shawn - master engine installer!
Glamor shot, getting ready to mount the engine!
Shawn, proud of his work
Engine mount bolts torqued, checked, and striped!
Fuel pumps in place.
Nov 15, 2023
Prepping for the engine
- (2 hours)
Category: Firewall
Spent some time getting the firewall ready so I can mount the engine tomorrow.
Putting insulation on the firewall
Getting ready to drill some holes
Working on the battery box
Riveting in the battery box
Look - it's attached!
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.